The existing pipework lacked high-pressure test certifications and was replaced with certified high-pressure piping to ensure safety and compliance.
Simultaneously, a new, larger pump was installed to meet operational demands, and the original, smaller pump was relocated upstream to the front of the line. This upgrade ensures full regulatory compliance and improved system efficiency.