Recyling Plant 2025

Full installation at recycling plant.

6″ main flow and return in thin wall stainless steel.

Serving 3 existing machines and 1 new machine.

The free cooler and chiller were delivered on a tight shut down.

The frame and all the pipework was pre fabricated in our workshop to enable this to happen over a 2 day period casing minimum disruption for the client.